Form preview

Get the free AIA A133 Construction Manager Agreement

Get Form
We are not affiliated with any brand or entity on this form
Illustration
Fill out
Complete the form online in a simple drag-and-drop editor.
Illustration
eSign
Add your legally binding signature or send the form for signing.
Illustration
Share
Share the form via a link, letting anyone fill it out from any device.
Illustration
Export
Download, print, email, or move the form to your cloud storage.

Why pdfFiller is the best tool for your documents and forms

GDPR
AICPA SOC 2
PCI
HIPAA
CCPA
FDA

End-to-end document management

From editing and signing to collaboration and tracking, pdfFiller has everything you need to get your documents done quickly and efficiently.

Accessible from anywhere

pdfFiller is fully cloud-based. This means you can edit, sign, and share documents from anywhere using your computer, smartphone, or tablet.

Secure and compliant

pdfFiller lets you securely manage documents following global laws like ESIGN, CCPA, and GDPR. It's also HIPAA and SOC 2 compliant.
Form preview

What is A133 Agreement

The AIA A133 Construction Manager Agreement is a legal document used by owners and construction managers to outline payment terms based on cost plus a fee with a guaranteed maximum price.

pdfFiller scores top ratings on review platforms

Users Most Likely To Recommend - Summer 2025
Grid Leader in Small-Business - Summer 2025
High Performer - Summer 2025
Regional Leader - Summer 2025
Show more Show less
Fill fillable A133 Agreement form: Try Risk Free
Rate free A133 Agreement form
4.7
satisfied
43 votes

Who needs A133 Agreement?

Explore how professionals across industries use pdfFiller.
Picture
A133 Agreement is needed by:
  • Owners seeking construction management services
  • Construction managers entering contracts with property owners
  • Architects involved in construction project agreements
  • Legal professionals handling construction-related contracts
  • Real estate developers requiring standardized agreements

How to fill out the A133 Agreement

  1. 1.
    Begin by accessing pdfFiller and searching for 'AIA A133 Construction Manager Agreement'. You can find it in the legal forms section or enter the name in the search bar.
  2. 2.
    Once you’ve located the form, click to open it in the editing interface. Familiarize yourself with the layout and placement of fields.
  3. 3.
    Before filling out the form, gather necessary information such as project details, names and contact information of involved parties, and specific payment terms based on your agreement.
  4. 4.
    Start completing the required fields by clicking on each blank space. Use the text tools on pdfFiller to enter data directly into the document.
  5. 5.
    Make sure to accurately input the Owner, Construction Manager, and Architect information in the designated sections to avoid any discrepancies.
  6. 6.
    As you fill in the form, utilize pdfFiller's features to add dates and any additional notes relevant to the contract.
  7. 7.
    After completing all fields, carefully review the document for any missing information or errors. Double-check names, dates, and terms to ensure accuracy.
  8. 8.
    Once finalized, save your progress on pdfFiller. You can opt to download the form as a PDF or submit it electronically according to your requirements.
  9. 9.
    Make sure to keep a copy for your records after saving or printing the completed form.
Regular content decoration

FAQs

If you can't find what you're looking for, please contact us anytime!
The AIA A133 Construction Manager Agreement is designed for owners and construction managers in the U.S., particularly in New York. Any party looking to establish a formal relationship for construction management in these areas can utilize this form.
The AIA A133 agreement requires signatures from all involved parties, including the Owner, Construction Manager, and Architect. Ensure that all roles are filled out and that everyone is present during the signing process.
There are typically no formal deadlines for using the AIA A133 agreement; however, it is advisable to complete it before the start of any construction work, ensuring all parties are in agreement on terms.
The AIA A133 agreement can be submitted through electronic means or by hard copy, depending on the preferences of the parties involved. After signing, distribute copies to all parties in the arrangement.
While the AIA A133 form primarily stands alone, it is advisable to include relevant project documentation and any preliminary agreements that outline project specifics. This ensures clarity and avoids future disputes.
Common mistakes include leaving blank fields, incorrect names or titles, and not reviewing for accuracy. Ensure all sections are filled to avoid delays or legal issues later.
Processing times for the AIA A133 agreement vary based on the speed of agreement among parties. Typically, once filled and signed, it can be processed immediately if all parties are ready to proceed.
If you believe that this page should be taken down, please follow our DMCA take down process here .
This form may include fields for payment information. Data entered in these fields is not covered by PCI DSS compliance.