Form preview

Get the free New York City Construction Code TR1 Form

Get Form
We are not affiliated with any brand or entity on this form
Illustration
Fill out
Complete the form online in a simple drag-and-drop editor.
Illustration
eSign
Add your legally binding signature or send the form for signing.
Illustration
Share
Share the form via a link, letting anyone fill it out from any device.
Illustration
Export
Download, print, email, or move the form to your cloud storage.

Why pdfFiller is the best tool for your documents and forms

GDPR
AICPA SOC 2
PCI
HIPAA
CCPA
FDA

End-to-end document management

From editing and signing to collaboration and tracking, pdfFiller has everything you need to get your documents done quickly and efficiently.

Accessible from anywhere

pdfFiller is fully cloud-based. This means you can edit, sign, and share documents from anywhere using your computer, smartphone, or tablet.

Secure and compliant

pdfFiller lets you securely manage documents following global laws like ESIGN, CCPA, and GDPR. It's also HIPAA and SOC 2 compliant.
Form preview

What is NYC TR1 Form

The New York City Construction Code TR1 Form is a technical report used by applicants to provide detailed information required for building permit applications in New York City.

pdfFiller scores top ratings on review platforms

Users Most Likely To Recommend - Summer 2025
Grid Leader in Small-Business - Summer 2025
High Performer - Summer 2025
Regional Leader - Summer 2025
Show more Show less
Fill fillable NYC TR1 form: Try Risk Free
Rate free NYC TR1 form
4.8
satisfied
42 votes

Who needs NYC TR1 Form?

Explore how professionals across industries use pdfFiller.
Picture
NYC TR1 Form is needed by:
  • Design Applicants needing to submit a permit application.
  • Special Inspections Applicants responsible for overseeing inspections.
  • Progress Inspections Applicants tracking construction progress.
  • Owners of properties undergoing construction.
  • Inspection Applicants ensuring code compliance.

How to fill out the NYC TR1 Form

  1. 1.
    To begin, access the pdfFiller website and search for the New York City Construction Code TR1 Form.
  2. 2.
    Open the form from your dashboard by selecting the upload option or searching for the specific form in the library.
  3. 3.
    Review each section of the form and familiarize yourself with the fields that need to be filled out.
  4. 4.
    Gather all necessary information beforehand, including your project's location, detailed descriptions, inspection requirements, and signatory details for the Design Applicant, Owner, and Inspection Applicant.
  5. 5.
    Start filling in the fields sequentially, ensuring all information is accurate and complete, using typewritten input on pdfFiller’s interface.
  6. 6.
    Use the checkbox options where applicable to indicate specific inspections required for your project.
  7. 7.
    Remember to print the 'Name (please print)', 'Signature Date', and 'P.E. / R.A. Seal' sections, ensuring all required signatures are collected.
  8. 8.
    Once completed, review the entire form for any errors or missing information.
  9. 9.
    After thorough review, save your changes using the 'Save' button to keep a copy on pdfFiller.
  10. 10.
    Download the final version in your preferred format or submit the completed form directly to the Department of Buildings through pdfFiller, following the provided submission options.
Regular content decoration

FAQs

If you can't find what you're looking for, please contact us anytime!
The TR1 Form can be submitted by Design Applicants, Special Inspections Applicants, Progress Inspections Applicants, Owners, and Inspection Applicants involved in the building permit application process in New York City.
While specific deadlines can vary based on project timelines, it is advisable to submit the TR1 Form as soon as possible during the permit application process to avoid delays in construction approvals.
The TR1 Form can be submitted either through pdfFiller’s online submission feature or printed and manually submitted to the Department of Buildings. Ensure all signatures and necessary information are included before submission.
Typically, supporting documents may include project plans, inspection schedules, and any other relevant technical reports that demonstrate compliance with New York construction codes.
Common mistakes include leaving fields blank, incorrect signatures, failing to use typewritten input, and missing required sections for inspections. Always double-check for completeness and accuracy.
Processing times for the TR1 Form can vary. It is generally advisable to allow 2-4 weeks for review, but this can depend on the volume of submissions and specific department workflows.
There may be fees applicable for submitting the TR1 Form as part of the overall building permit application process. Check with the Department of Buildings for the most current fee schedule.
If you believe that this page should be taken down, please follow our DMCA take down process here .
This form may include fields for payment information. Data entered in these fields is not covered by PCI DSS compliance.