Get the free Change Order for Construction or Repairs by Contractor template

Get Form
This form may be used when a change needs to be made to the original contract between a subcontractor and contractor. The change order works to amend the original contract. The example provided
We are not affiliated with any brand or entity on this form
Illustration
Fill out
Complete the form online in a simple drag-and-drop editor.
Illustration
eSign
Add your legally binding signature or send the form for signing.
Illustration
Share
Share the form via a link, letting anyone fill it out from any device.
Illustration
Export
Download, print, email, or move the form to your cloud storage.

Why choose pdfFiller for your legal forms?

GDPR
AICPA SOC 2
PCI
HIPAA
CCPA
FDA

All-in-one solution

pdfFiller offers a PDF editor, eSignatures, file sharing, collaboration tools, and secure storage—all in one place.

Easy to use

pdfFiller is simple, cloud-based, has a mobile app, and requires no downloads or a steep learning curve.

Secure and compliant

With encryption, user authentication, and certifications like HIPAA, SOC 2 Type II, and PCI DSS, pdfFiller keeps sensitive legal forms secure.
Form preview

What is change order for construction

A change order for construction is a formal document that modifies the original construction contract, outlining changes to scope, timelines, or costs.

pdfFiller scores top ratings on review platforms

Users Most Likely To Recommend - Summer 2025
Grid Leader in Small-Business - Summer 2025
High Performer - Summer 2025
Regional Leader - Summer 2025
This is an amazing program! How many times we all have to fill out forms, even if they are pdf forms available for downloading on line) and wish we could just fill them in with the keyboard instead of printing out a hard copy and THEN handwriting our responses. PDFfiller allows you to save a pdf and then fill it in so easily. There are also a lot of options for checking boxes, circling responses, highlighting, enlarging or shrinking text size, etc. The program is user-friendly, easy to follow, print, download to your own computer and save. Just a GREAT addition to my tools. I also get such positive feedback whenever I submit a requested form---they are delighted to have READABLE information.
Judy N
I've been very impressed so far. I used PDFfiller to draft and deliver a contract for the sale of my house. It was super simple.
Simon
Easy to use, very cost effective, no problems with the forms/bids I've used this on --- very happy with the product!
mike
Very clear and user friendly. I would be helpful if the "printing" the document process was not so lengthy.
Diamond B
I often have to fill out pdf documents for work. This is hands down the best program I have used.
Richmond C
I'm in love!!! it walks you through everything.
Rachel B
Show more Show less
Fill fillable change order for construction form: Try Risk Free
Rate free change order for construction form
4.4
satisfied
22 votes

Who needs change order for construction?

Explore how professionals across industries use pdfFiller.
Picture
Change order for construction is needed by:
  • Contractors
  • Subcontractors
  • Project managers
  • Property owners
  • Construction managers

Comprehensive guide to construction change orders

How does understanding change orders benefit construction projects?

Understanding change orders is crucial for ensuring construction projects are completed efficiently and legally. A change order is a formal request to modify the original construction contract, impacting scope, cost, or timeline. Notably, the timely execution of change orders can prevent budget overruns and delays, making it a critical aspect of project management. Additionally, failing to handle change orders properly could lead to legal disputes, highlighting their significance in the construction industry.
  • A change order in construction serves as an official request to alter any aspect of a project, including changes to plans, design, or construction methods.
  • Proper management of change orders ensures that projects remain within budget and on schedule, which is vital for operational success.
  • Inadequately documented change orders may result in disputes or claims that could lead to litigation, impacting future business relationships.

What are the key components of a change order form?

A construction change order form comprises several essential elements that must be filled out accurately to facilitate proper understanding and processing. Each section of the form serves a specific purpose, clarifying responsibilities, project details, and financial implications.
  • Key components include the project name, date, description of changes, and signatures from relevant parties.
  • Fields denote participants such as the owner and contractor, providing structure for documentation and accountability.
  • The effective date is critical, as it informs parties when changes will take effect, impacting planning and resource allocation.
  • These are clauses that may introduce specific stipulations or stipulations that impact the overall agreement.

How do you fill out a change order form correctly?

Filling out a change order form requires careful attention to detail to avoid errors that could complicate project processes. By adhering to a systematic approach and focusing on clarity, accuracy, and thoroughness, the form should be completed effectively.
  • Start with identifying the project, fill in the change request specifics, and ensure all parties’ details are included.
  • Errors include incomplete fields, unclear wording, and missing signatures; avoid these by double-checking each entry.
  • Use clear language and standard terms to ensure all stakeholders understand the changes being proposed.

What should you consider regarding payment and credit for change orders?

Calculating payment and credit considerations is vital for both contractors and clients to manage finances accurately during a construction project. Understanding when costs may increase or decrease and the timelines for payments are critical for successful change order management.
  • Credits apply when project costs decrease; accurate calculations ensure fair compensation and financial clarity.
  • Recognizing scenarios such as scope expansion or unforeseen conditions that justify increased expenses is crucial for negotiation.
  • Familiarize yourself with stages of construction and correlate them with payment due dates to streamline cash flow.

How do additional terms and conditions affect change orders?

Incorporating additional terms into a change order can protect all parties involved by clearly outlining specific conditions or expectations. It’s essential to document these terms carefully to avoid any misunderstandings that can lead to disputes.
  • They provide added context and stipulations that protect stakeholders' interests.
  • Ensure clarity by carefully wording and integrating any additional terms into the change order form.
  • Examples include extended deadlines, labor rates adjustments, or changes in project scope.

What is the acceptance process for change orders?

The acceptance process of change orders can significantly impact project execution, necessitating formal agreement from all involved parties. Documenting acceptance ensures everyone is on the same page, reducing the likelihood of future conflicts.
  • The form should include signatures from both the subcontractor and contractor, formalizing the acceptance of changes.
  • Acceptance implies that all parties agree with the changes and how they will be implemented moving forward.
  • Maintain thorough records of accepted change orders to facilitate reference and dispute resolution down the line.

What are common mistakes in change order management?

Identifying common mistakes in change order management can guide teams in streamlining processes for better effectiveness. Enhancing awareness of these pitfalls helps avoid future complications and improves overall project outcomes.
  • Common errors include insufficient documentation, late submissions, or not securing necessary approvals.
  • Implement a checklist for change order submission to avoid common errors and improve tracking.
  • An analysis of mismanaged change orders illustrates the need for clear processes and communication among all parties.

How can pdfFiller simplify the change order process?

pdfFiller offers valuable tools that can significantly enhance the creation and management of change orders, enabling seamless collaboration and effective documentation. Utilizing features such as e-signatures facilitates rapid approvals and makes changes manageable in real-time.
  • Users can easily create customized change order forms and manage them efficiently through pdfFiller.
  • Collaborate with team members smoothly, ensuring that feedback and revisions are integrated seamlessly.
  • Quick approvals through e-signature functionalities eliminate delays, enhancing overall project efficiency.

How to fill out the change order for construction

  1. 1.
    Open the change order template on pdfFiller.
  2. 2.
    Enter the project name and address at the top of the document.
  3. 3.
    Fill in the contractor's name and contact information.
  4. 4.
    Specify the original contract number or project reference.
  5. 5.
    Detail the changes being made, including descriptions and reasons for the changes.
  6. 6.
    Add the proposed new timeline and any adjustments to costs or payment schedules.
  7. 7.
    Include sections for both the contractor's and the owner's signatures.
  8. 8.
    Review the entire document for accuracy and completeness.
  9. 9.
    Save the filled-out document and send it for review or signature.
Regular content decoration
If you believe that this page should be taken down, please follow our DMCA take down process here .
This form may include fields for payment information. Data entered in these fields is not covered by PCI DSS compliance.