
Get the free FERC Form No. 714 Annual Electric Control and Planning Area Report - ferc
Show details
This document outlines the Federal Energy Regulatory Commission's final rule regarding the electronic filing of FERC Form No. 714, which pertains to the annual reporting requirements for electric
We are not affiliated with any brand or entity on this form
Get, Create, Make and Sign ferc form no 714

Edit your ferc form no 714 form online
Type text, complete fillable fields, insert images, highlight or blackout data for discretion, add comments, and more.

Add your legally-binding signature
Draw or type your signature, upload a signature image, or capture it with your digital camera.

Share your form instantly
Email, fax, or share your ferc form no 714 form via URL. You can also download, print, or export forms to your preferred cloud storage service.
Editing ferc form no 714 online
To use our professional PDF editor, follow these steps:
1
Register the account. Begin by clicking Start Free Trial and create a profile if you are a new user.
2
Prepare a file. Use the Add New button. Then upload your file to the system from your device, importing it from internal mail, the cloud, or by adding its URL.
3
Edit ferc form no 714. Replace text, adding objects, rearranging pages, and more. Then select the Documents tab to combine, divide, lock or unlock the file.
4
Save your file. Choose it from the list of records. Then, shift the pointer to the right toolbar and select one of the several exporting methods: save it in multiple formats, download it as a PDF, email it, or save it to the cloud.
It's easier to work with documents with pdfFiller than you can have ever thought. Sign up for a free account to view.
Uncompromising security for your PDF editing and eSignature needs
Your private information is safe with pdfFiller. We employ end-to-end encryption, secure cloud storage, and advanced access control to protect your documents and maintain regulatory compliance.
How to fill out ferc form no 714

How to fill out FERC Form No. 714 Annual Electric Control and Planning Area Report
01
Gather the required information about your utility's operations, including electricity generation and consumption data.
02
Review the reporting period and ensure all data corresponds to the correct time frame.
03
Access the FERC Form No. 714 from the FERC website or your utility's reporting tools.
04
Fill in the identification section with your utility's name, address, and contact information.
05
Complete the section on electric control areas, detailing the areas served and their respective load data.
06
Provide information regarding the planned capacity additions or reductions, including timelines.
07
Include data on relevant system outages or issues that may affect planning.
08
Review the entire form for accuracy and completeness before submitting.
09
Submit the completed form to FERC through the prescribed online portal or by email by the deadline.
Who needs FERC Form No. 714 Annual Electric Control and Planning Area Report?
01
Electric utilities that operate in the United States and are involved in the generation, transmission, and distribution of electric power.
02
Organizations that are required to report operational data for regulatory compliance and planning purposes.
03
Regional Transmission Organizations (RTOs) and Independent System Operators (ISOs) involved in electricity coordination.
Fill
form
: Try Risk Free
People Also Ask about
Who does FERC apply to?
What industries does FERC regulate and operate? FERC regulates the natural gas, electricity, oil and hydropower industries.
Who is required to file a FERC Form 1?
Each Major electric utility, licensee, or other, as classified in the Commission's Uniform System of Accounts Prescribed for Public Utilities and Licensees Subject To the Provisions of The Federal Power Act (18 C.F.R. Part 101), must submit FERC Form 1 (18 C.F.R.
What is FERC reporting?
These reports are also considered to be a non-confidential public use forms. Each natural gas company whose combined gas transported or stored for a fee exceed 50 million dekatherms in each of the previous three years must submit FERC Form 2 and 3-Q.
What is the purpose of the FERC?
Access the ISO's submissions of FERC Form No. 715–Annual Transmission Planning and Evaluation Report. Each transmitting utility that operates integrated transmission system facilities that are rated at or above 100 kilovolts (kV) must annually submit this information the Federal Energy Regulatory Commission (FERC).
What is a FERC permit?
In summary, NERC is a non-profit regulatory body that focuses on ensuring the reliability and security of the bulk power system, while FERC is a government agency that regulates the interstate transmission of electricity and other energy commodities, as well as hydroelectric projects.
What is FERC Form 715?
Under the authority of the Federal Power Act, FERC has the exclusive authority to license most non-federal hydropower projects located on navigable waterways or federal lands, or connected to the interstate electric grid. Applicants for licenses may use the Integrated, Traditional, or Alternative Licensing Processes.
Who files FERC Form 2?
These reports are also considered to be a non-confidential public use forms. Each natural gas company whose combined gas transported or stored for a fee exceed 50 million dekatherms in each of the previous three years must submit FERC Form 2 and 3-Q.
What is FERC form 714?
The FERC Form 714 (Form 714) collects information for the Federal Energy Regulatory Commission (FERC, Commission) from electric utility balancing authority and planning areas in the United States. The Form 714 is authorized by the Federal Power Act and is a regulatory support requirement as provided by 18 CFR § 141.51.
For pdfFiller’s FAQs
Below is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.
What is FERC Form No. 714 Annual Electric Control and Planning Area Report?
FERC Form No. 714 is an annual report that provides data related to the electric control areas and planning regions, facilitating the Federal Energy Regulatory Commission's (FERC) oversight of the electric industry.
Who is required to file FERC Form No. 714 Annual Electric Control and Planning Area Report?
Electric utility companies that operate in control areas defined by FERC are required to file the FERC Form No. 714.
How to fill out FERC Form No. 714 Annual Electric Control and Planning Area Report?
To fill out FERC Form No. 714, utilities must collect and report data on electric generation, demand, and transmission, following specific guidelines and instructions provided by FERC for accurate reporting.
What is the purpose of FERC Form No. 714 Annual Electric Control and Planning Area Report?
The purpose of FERC Form No. 714 is to ensure that FERC has the necessary information to assess and analyze the reliability and capability of the electric grid and to facilitate planning and coordination among control areas.
What information must be reported on FERC Form No. 714 Annual Electric Control and Planning Area Report?
The report must include information on generation capacity, energy supply, demand forecasts, interconnections, and any significant operational changes within the control area.
Fill out your ferc form no 714 online with pdfFiller!
pdfFiller is an end-to-end solution for managing, creating, and editing documents and forms in the cloud. Save time and hassle by preparing your tax forms online.

Ferc Form No 714 is not the form you're looking for?Search for another form here.
Relevant keywords
Related Forms
If you believe that this page should be taken down, please follow our DMCA take down process
here
.
This form may include fields for payment information. Data entered in these fields is not covered by PCI DSS compliance.