This document outlines the procedures for compiling and processing as-built drawings and records, detailing responsibilities and processes for project completion and documentation control.
We are not affiliated with any brand or entity on this form

Get, Create, Make and Sign as-built procedure and document

Edit
Edit your as-built procedure and document form online
Type text, complete fillable fields, insert images, highlight or blackout data for discretion, add comments, and more.
Add
Add your legally-binding signature
Draw or type your signature, upload a signature image, or capture it with your digital camera.
Share
Share your form instantly
Email, fax, or share your as-built procedure and document form via URL. You can also download, print, or export forms to your preferred cloud storage service.

Editing as-built procedure and document online

9.5
Ease of Setup
pdfFiller User Ratings on G2
9.0
Ease of Use
pdfFiller User Ratings on G2
Use the instructions below to start using our professional PDF editor:
1
Set up an account. If you are a new user, click Start Free Trial and establish a profile.
2
Prepare a file. Use the Add New button to start a new project. Then, using your device, upload your file to the system by importing it from internal mail, the cloud, or adding its URL.
3
Edit as-built procedure and document. Rearrange and rotate pages, add and edit text, and use additional tools. To save changes and return to your Dashboard, click Done. The Documents tab allows you to merge, divide, lock, or unlock files.
4
Save your file. Select it in the list of your records. Then, move the cursor to the right toolbar and choose one of the available exporting methods: save it in multiple formats, download it as a PDF, send it by email, or store it in the cloud.
With pdfFiller, it's always easy to work with documents.

Uncompromising security for your PDF editing and eSignature needs

Your private information is safe with pdfFiller. We employ end-to-end encryption, secure cloud storage, and advanced access control to protect your documents and maintain regulatory compliance.
GDPR
AICPA SOC 2
PCI
HIPAA
CCPA
FDA

How to fill out as-built procedure and document

Illustration

How to fill out As-Built Procedure and Document Control Processing

01
Gather all relevant project documentation, including drawings, change orders, and specifications.
02
Identify changes made during construction that differ from the original plans.
03
Create an As-Built drawing that reflects these changes accurately, marking all alterations clearly.
04
Document all deviations from the original design, including the reasons for changes and any agreements or approvals.
05
Compile supporting documents, such as photographs, test reports, and inspection records, to substantiate the As-Built drawings.
06
Review the As-Built documentation for accuracy and completeness with project stakeholders.
07
Submit the finalized As-Built documents for approval to relevant authorities or project managers as required.
08
Establish a document control process to manage the distribution and storage of As-Built documents efficiently.

Who needs As-Built Procedure and Document Control Processing?

01
Project managers responsible for overseeing construction projects.
02
Contractors who require accurate records of changes for compliance and final billing.
03
Engineers and architects needing up-to-date information for future maintenance or modifications.
04
Regulatory agencies that may require documentation for safety and compliance checks.
05
Clients or owners of the project who need final records for future reference or warranty purposes.
Fill form : Try Risk Free
Users Most Likely To Recommend - Summer 2025
Grid Leader in Small-Business - Summer 2025
High Performer - Summer 2025
Regional Leader - Summer 2025
Easiest To Do Business With - Summer 2025
Best Meets Requirements- Summer 2025
Rate the form
4.6
Satisfied
44 Votes

People Also Ask about

Definition. A set of drawings that are marked-up by the contractor building a facility or fabricating a piece of equipment that show how the item or facility was actually built versus the way it was originally designed. At the completion of a project, the as-built drawings describe what was actually built.
The As Built Documentation Pre-Built Automation takes an Admin Essentials installed Pre-Built and creates a document in markdown format that includes each component of the Pre-Built, as well as the relationships between the components.
Redline drawings are architectural drawings that have been printed, reviewed, and marked up with errors, changes, and revisions. The markups are typically done in red ink to make them easier to find, hence the name Redline Drawings.
Definition. A set of drawings that are marked-up by the contractor building a facility or fabricating a piece of equipment that show how the item or facility was actually built versus the way it was originally designed. At the completion of a project, the as-built drawings describe what was actually built.
Redline drawings are not official plans, meaning they cannot be used to obtain updated permits. As-builts, however, are official sets of plans.
As-built documentation is the final set of drawings, plans, or models of a construction project as it was actually built, with all changes and deviations made during the construction process. Unlike initial design plans, as-built documents provide a precise record of the project's current state.
As-built and record drawings are essential for accurate documentation of a building project. As-built drawings reflect the actual construction, including any on-site changes made. Record drawings are the architect-approved versions of as-built drawings.
As-Built refers to the final set of drawings or documentation that accurately represents the completed construction of a project. These documents reflect all changes and deviations made during the construction process, providing a detailed record of the project as it was actually built.
As-built and record drawings are essential for accurate documentation of a building project. As-built drawings reflect the actual construction, including any on-site changes made. Record drawings are the architect-approved versions of as-built drawings.

For pdfFiller’s FAQs

Below is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.

The As-Built Procedure refers to the process of documenting the actual specifications, dimensions, and design alterations of a project post-completion. Document Control Processing involves managing and maintaining those documents systematically to ensure accuracy and accessibility.
Typically, contractors, project managers, and construction supervisors are required to file As-Built Procedure and Document Control Processing to ensure compliance with project specifications and regulatory standards.
To fill out the As-Built Procedure and Document Control Processing, one must collect all pertinent documentation, complete the required forms with accurate data reflecting the actual conditions, and ensure that all revisions and changes from the original plans are clearly marked.
The purpose is to create an accurate and detailed account of the construction project as it was completed, providing valuable information for future reference, maintenance, and any necessary renovation or regulatory reviews.
The information that must be reported includes detailed drawings, specifications of materials used, any deviations from the original plan, and notes on any inspections or approvals received during the construction process.
Fill out your as-built procedure and document online with pdfFiller!

pdfFiller is an end-to-end solution for managing, creating, and editing documents and forms in the cloud. Save time and hassle by preparing your tax forms online.

Get started now
Form preview
If you believe that this page should be taken down, please follow our DMCA take down process here .
This form may include fields for payment information. Data entered in these fields is not covered by PCI DSS compliance.