Form preview

Get the free CATEGORY 2 NET METERING APPLICATION

Get Form
This document is an application for projects with generator output greater than 20 kW but less than or equal to 150 kW under the Category 2 Net Metering Program, applicable only to Renewable Generator
We are not affiliated with any brand or entity on this form

Get, Create, Make and Sign category 2 net metering

Edit
Edit your category 2 net metering form online
Type text, complete fillable fields, insert images, highlight or blackout data for discretion, add comments, and more.
Add
Add your legally-binding signature
Draw or type your signature, upload a signature image, or capture it with your digital camera.
Share
Share your form instantly
Email, fax, or share your category 2 net metering form via URL. You can also download, print, or export forms to your preferred cloud storage service.

How to edit category 2 net metering online

9.5
Ease of Setup
pdfFiller User Ratings on G2
9.0
Ease of Use
pdfFiller User Ratings on G2
To use the services of a skilled PDF editor, follow these steps:
1
Create an account. Begin by choosing Start Free Trial and, if you are a new user, establish a profile.
2
Upload a document. Select Add New on your Dashboard and transfer a file into the system in one of the following ways: by uploading it from your device or importing from the cloud, web, or internal mail. Then, click Start editing.
3
Edit category 2 net metering. Rearrange and rotate pages, add and edit text, and use additional tools. To save changes and return to your Dashboard, click Done. The Documents tab allows you to merge, divide, lock, or unlock files.
4
Save your file. Select it from your records list. Then, click the right toolbar and select one of the various exporting options: save in numerous formats, download as PDF, email, or cloud.
With pdfFiller, it's always easy to deal with documents.

Uncompromising security for your PDF editing and eSignature needs

Your private information is safe with pdfFiller. We employ end-to-end encryption, secure cloud storage, and advanced access control to protect your documents and maintain regulatory compliance.
GDPR
AICPA SOC 2
PCI
HIPAA
CCPA
FDA

How to fill out category 2 net metering

Illustration

How to fill out CATEGORY 2 NET METERING APPLICATION

01
Obtain the CATEGORY 2 NET METERING APPLICATION form from your local utility or their website.
02
Fill in your personal information including your name, address, and contact details.
03
Provide information about the installation site, including the address and type of property.
04
Indicate the type of renewable energy system you plan to install, such as solar panels or wind turbines.
05
Specify the expected energy production capacity of your system in kilowatts (kW).
06
Attach any required documentation, such as site plans, system specifications, and proof of ownership or lease of the property.
07
Review the application for completeness and accuracy.
08
Submit the completed application form along with all attachments to your utility company as instructed.

Who needs CATEGORY 2 NET METERING APPLICATION?

01
Residential and commercial property owners looking to install renewable energy systems and benefit from net metering.
02
Individuals or businesses seeking to reduce their energy costs through the use of solar, wind, or other renewable energy sources.
03
Those interested in contributing to grid sustainability by generating their own electricity.
Fill form : Try Risk Free
Users Most Likely To Recommend - Summer 2025
Grid Leader in Small-Business - Summer 2025
High Performer - Summer 2025
Regional Leader - Summer 2025
Easiest To Do Business With - Summer 2025
Best Meets Requirements- Summer 2025
Rate the form
4.5
Satisfied
52 Votes

For pdfFiller’s FAQs

Below is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.

CATEGORY 2 NET METERING APPLICATION is a formal request submitted by customers who wish to connect a net metering system, usually involving renewable energy sources like solar, to the grid for electricity use and credits for excess power generated.
Customers who intend to install a net metering system with a generation capacity between 10 kW and 1,000 kW, or those that are making changes to an existing net metering system, are required to file the CATEGORY 2 NET METERING APPLICATION.
To fill out the CATEGORY 2 NET METERING APPLICATION, applicants should provide their personal information, details about the proposed installation, including location, capacity, equipment specifications, and any relevant legal or technical documentation required by the utility company.
The purpose of CATEGORY 2 NET METERING APPLICATION is to ensure that customers comply with regulatory requirements, facilitate the safe interconnection of their renewable energy systems to the grid, and allow the utility provider to monitor and manage the integration of these systems effectively.
The information that must be reported includes the applicant's contact details, the location of the system, the specifics of the generation technology, expected generation capacity, system design and layout, and any other relevant information required by the utility or regulatory body.
Fill out your category 2 net metering online with pdfFiller!

pdfFiller is an end-to-end solution for managing, creating, and editing documents and forms in the cloud. Save time and hassle by preparing your tax forms online.

Get started now
Form preview
If you believe that this page should be taken down, please follow our DMCA take down process here .
This form may include fields for payment information. Data entered in these fields is not covered by PCI DSS compliance.