A checklist for ensuring that construction projects meet Riverton City standards and requirements, including sections on construction drawings, utility locations, grading, landscaping, and the necessary
We are not affiliated with any brand or entity on this form
Get, Create, Make and Sign as-built check list

Edit your as-built check list form online
Type text, complete fillable fields, insert images, highlight or blackout data for discretion, add comments, and more.

Add your legally-binding signature
Draw or type your signature, upload a signature image, or capture it with your digital camera.

Share your form instantly
Email, fax, or share your as-built check list form via URL. You can also download, print, or export forms to your preferred cloud storage service.
Editing as-built check list online
Follow the steps below to take advantage of the professional PDF editor:
1
Log in to your account. Start Free Trial and sign up a profile if you don't have one yet.
2
Prepare a file. Use the Add New button to start a new project. Then, using your device, upload your file to the system by importing it from internal mail, the cloud, or adding its URL.
3
Edit as-built check list. Rearrange and rotate pages, add new and changed texts, add new objects, and use other useful tools. When you're done, click Done. You can use the Documents tab to merge, split, lock, or unlock your files.
4
Get your file. When you find your file in the docs list, click on its name and choose how you want to save it. To get the PDF, you can save it, send an email with it, or move it to the cloud.
pdfFiller makes working with documents easier than you could ever imagine. Try it for yourself by creating an account!
Uncompromising security for your PDF editing and eSignature needs
Your private information is safe with pdfFiller. We employ end-to-end encryption, secure cloud storage, and advanced access control to protect your documents and maintain regulatory compliance.
How to fill out as-built check list

How to fill out As-Built Check List
01
Start by obtaining the As-Built Check List form from your project manager.
02
Review the project specifications and drawings to understand the requirements.
03
Begin filling out the project title and details at the top of the checklist.
04
As you progress, check off items related to construction and installations against the original plans.
05
For each item, provide accurate measurements and any deviations from the original drawings.
06
Include photographs where necessary to document the actual built conditions.
07
Ensure that all signatures and dates are filled out by relevant stakeholders.
08
Review the completed checklist for accuracy before submission.
Who needs As-Built Check List?
01
Contractors to ensure compliance with project specifications.
02
Project managers for project documentation and coordination.
03
Owners to verify that the project meets their expectations.
04
Inspectors for evaluating the completed work against the approved plans.
Fill
form
: Try Risk Free
People Also Ask about
How to check as-built drawings?
What Information Belongs on an As-Built Drawing? Changes in scale. Changes in sizing. Changes in materials. The dates of any and all changes. A list of obstructions encountered. Related shop drawings and appendices. Location of all utilities. Extra work.
What is the difference between as-built and proposed?
As-Built drawings should show the building exactly as it currently is, as opposed to a design drawing which shows the intended or proposed layout of the building. This is a critical distinction, because a constructed building almost never corresponds exactly to the original design drawings.
What do as-built drawings look like?
Dimensions: As-built drawings should contain the exact dimensions of the space, as these are essential for future renovations, maintenance, and record-keeping. Material specs: Include details about all materials used in the building project, including the type of material, manufacturer, level of quality, etc.
How to review construction drawings?
1 Use a standard format. One of the first steps to review and revise construction drawings is to use a standard format that is consistent, organized, and easy to read. 2 Check for compliance. 3 Compare with other drawings. 4 Use software tools. 5 Seek feedback. 6 Update regularly.
What is included in the as-built plan?
These drawings should illustrate any variations from the original construction drawings, including changes to specifications, dimensions, materials, and location. As-built drawings should include: Dates and detailed notes of any modifications. Changes to materials used (type, size, location, etc.)
What is an as-built drawing?
Also known as record drawings and red-line drawings, as-builts drawings are documents that allow a compare and contrast between the designed versus final specifications, and provide a detailed blueprint of the building and the land around it as actually constructed in the end.
What are as-built drawings examples?
These drawings may include various types such as floor plans, ceiling plans, exterior elevations, and more, depending on the specific needs. Having them done accurately and up-to-date can greatly benefit the project management process.
How to check structural drawings?
Drawing Layout: Organize drawings with proper layout, scaling, and dimensions. Plan Views: Include plan views for each level of the structure. Elevation and Section Views: Provide elevation and section views to show vertical relationships and cross-sections.
For pdfFiller’s FAQs
Below is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.
What is As-Built Check List?
The As-Built Check List is a document that records the actual construction and installation details of a project, reflecting any changes made during the construction process.
Who is required to file As-Built Check List?
Typically, the contractor or builder is required to file the As-Built Check List to ensure compliance with construction specifications and regulations.
How to fill out As-Built Check List?
To fill out the As-Built Check List, the contractor should document all deviations from the original plans and specifications, including dimensions, materials used, and any modifications made during construction.
What is the purpose of As-Built Check List?
The purpose of the As-Built Check List is to provide an accurate record of the project as constructed, enabling future maintenance, renovations, or inspections based on actual conditions.
What information must be reported on As-Built Check List?
The As-Built Check List must report information such as the location of utilities, structural changes, material specifications, site conditions, and any discrepancies from the original design.
Fill out your as-built check list online with pdfFiller!
pdfFiller is an end-to-end solution for managing, creating, and editing documents and forms in the cloud. Save time and hassle by preparing your tax forms online.

As-Built Check List is not the form you're looking for?Search for another form here.
Relevant keywords
If you believe that this page should be taken down, please follow our DMCA take down process
here
.
This form may include fields for payment information. Data entered in these fields is not covered by PCI DSS compliance.