This document serves as an application form for customers wishing to attach non-inverter based parallel generation equipment to the electric system of Orange & Rockland Utilities.
We are not affiliated with any brand or entity on this form

Get, Create, Make and Sign new york state standarized

Edit
Edit your new york state standarized form online
Type text, complete fillable fields, insert images, highlight or blackout data for discretion, add comments, and more.
Add
Add your legally-binding signature
Draw or type your signature, upload a signature image, or capture it with your digital camera.
Share
Share your form instantly
Email, fax, or share your new york state standarized form via URL. You can also download, print, or export forms to your preferred cloud storage service.

Editing new york state standarized online

9.5
Ease of Setup
pdfFiller User Ratings on G2
9.0
Ease of Use
pdfFiller User Ratings on G2
In order to make advantage of the professional PDF editor, follow these steps below:
1
Log in. Click Start Free Trial and create a profile if necessary.
2
Simply add a document. Select Add New from your Dashboard and import a file into the system by uploading it from your device or importing it via the cloud, online, or internal mail. Then click Begin editing.
3
Edit new york state standarized. Add and replace text, insert new objects, rearrange pages, add watermarks and page numbers, and more. Click Done when you are finished editing and go to the Documents tab to merge, split, lock or unlock the file.
4
Get your file. When you find your file in the docs list, click on its name and choose how you want to save it. To get the PDF, you can save it, send an email with it, or move it to the cloud.
pdfFiller makes working with documents easier than you could ever imagine. Register for an account and see for yourself!

Uncompromising security for your PDF editing and eSignature needs

Your private information is safe with pdfFiller. We employ end-to-end encryption, secure cloud storage, and advanced access control to protect your documents and maintain regulatory compliance.
GDPR
AICPA SOC 2
PCI
HIPAA
CCPA
FDA

How to fill out new york state standarized

Illustration

How to fill out NEW YORK STATE STANDARIZED APPLICATION FOR ATTACHMENT OF NON-INVERTER BASED PARALLEL GENERATION EQUIPMENT TO THE ELECTRIC SYSTEM

01
Obtain the New York State Standardized Application form from the appropriate regulatory agency or website.
02
Fill out the applicant's contact information, including name, address, and phone number.
03
Provide details of the proposed parallel generation equipment, including type, capacity, and technical specifications.
04
Include the location where the equipment will be installed and a description of the site.
05
Complete any required documentation regarding the electrical connections to the utility grid.
06
Attach any necessary engineering studies or analyses related to the installation.
07
Sign and date the application form to confirm its accuracy.
08
Submit the completed application form along with any required fees to the designated utility or regulatory body.

Who needs NEW YORK STATE STANDARIZED APPLICATION FOR ATTACHMENT OF NON-INVERTER BASED PARALLEL GENERATION EQUIPMENT TO THE ELECTRIC SYSTEM?

01
Individuals or businesses planning to install non-inverter based parallel generation equipment, such as generators or turbines, that will connect to the electric system in New York State.
02
Utility companies that require a standardized application to ensure compliance with regulatory standards for attaching parallel generation equipment.
Fill form : Try Risk Free
Users Most Likely To Recommend - Summer 2025
Grid Leader in Small-Business - Summer 2025
High Performer - Summer 2025
Regional Leader - Summer 2025
Easiest To Do Business With - Summer 2025
Best Meets Requirements- Summer 2025
Rate the form
4.6
Satisfied
61 Votes

People Also Ask about

An interconnect agreement is a business contract between a utility and a customer for the purpose of interconnecting their facility for the potential of exchanging electric energy. The agreement documents the terms of the relationship and the requirements of both parties.
NREL provides information and resources to U.S. states and communities on interconnection standards — how renewable energy systems can be legally connected to the electricity grid. Interconnection standards are a set of requirements and procedures for both utilities and customers.
Average Interconnection costs have grown. For projects still actively moving through the queue (“active”), mean costs have grown even more in recent years, from $29/kW to $240/kW (2017-2019 vs. 2020- 2022, median: $8 to $85/kW).
• Coordinated Electric System Interconnection Review (CESIR) – Is a comprehensive engineering study to. understand the project's impact to the utility system and determine what construction upgrades, if any, will be required to the National Grid system.
An inverter intended for use in parallel with power sources such as an electric utility to supply common loads and capable of delivering power to the utility is called a dual-mode interactive inverter. This type of inverter can both draw power from the utility and supply power back to it.
• Coordinated Electric System Interconnection Review (CESIR) – Is a comprehensive engineering study to. understand the project's impact to the utility system and determine what construction upgrades, if any, will be required to the National Grid system.

For pdfFiller’s FAQs

Below is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.

The New York State Standardized Application for Attachment of Non-Inverter Based Parallel Generation Equipment to the Electric System is a form used for the approval process of connecting non-inverter based generation equipment, such as a large generator or other generation technologies, to the local electric utility grid.
Any individual or entity that intends to connect non-inverter based parallel generation equipment to the electric system is required to file this application. This typically includes businesses, organizations, or homeowners who have larger generation systems.
To fill out the application, you need to provide detailed information about the generation equipment, including specifications, the proposed connection point, electrical system impact, and compliance with safety regulations. Additional supporting documentation might also be required, such as system diagrams or proof of insurance.
The purpose of this application is to ensure that any non-inverter based generation equipment can be safely and effectively integrated into the existing electric grid while safeguarding the reliability and stability of the electrical system for all users.
The application must report essential information including the name and contact information of the applicant, specifications of the generation equipment, connection type, electrical capacity, installation details, and any potential impact on the electric system.
Fill out your new york state standarized online with pdfFiller!

pdfFiller is an end-to-end solution for managing, creating, and editing documents and forms in the cloud. Save time and hassle by preparing your tax forms online.

Get started now
Form preview
If you believe that this page should be taken down, please follow our DMCA take down process here .
This form may include fields for payment information. Data entered in these fields is not covered by PCI DSS compliance.