This Agreement outlines the terms for interconnecting a Customer's electric generating facility with the Utility's distribution system for projects of 20 kW or less, including operational and maintenance
We are not affiliated with any brand or entity on this form

Get, Create, Make and Sign interconnection and parallel operating

Edit
Edit your interconnection and parallel operating form online
Type text, complete fillable fields, insert images, highlight or blackout data for discretion, add comments, and more.
Add
Add your legally-binding signature
Draw or type your signature, upload a signature image, or capture it with your digital camera.
Share
Share your form instantly
Email, fax, or share your interconnection and parallel operating form via URL. You can also download, print, or export forms to your preferred cloud storage service.

Editing interconnection and parallel operating online

9.5
Ease of Setup
pdfFiller User Ratings on G2
9.0
Ease of Use
pdfFiller User Ratings on G2
To use our professional PDF editor, follow these steps:
1
Set up an account. If you are a new user, click Start Free Trial and establish a profile.
2
Prepare a file. Use the Add New button. Then upload your file to the system from your device, importing it from internal mail, the cloud, or by adding its URL.
3
Edit interconnection and parallel operating. Rearrange and rotate pages, add new and changed texts, add new objects, and use other useful tools. When you're done, click Done. You can use the Documents tab to merge, split, lock, or unlock your files.
4
Get your file. When you find your file in the docs list, click on its name and choose how you want to save it. To get the PDF, you can save it, send an email with it, or move it to the cloud.
With pdfFiller, it's always easy to work with documents. Try it!

Uncompromising security for your PDF editing and eSignature needs

Your private information is safe with pdfFiller. We employ end-to-end encryption, secure cloud storage, and advanced access control to protect your documents and maintain regulatory compliance.
GDPR
AICPA SOC 2
PCI
HIPAA
CCPA
FDA

How to fill out interconnection and parallel operating

Illustration

How to fill out Interconnection and Parallel Operating Agreement

01
Begin by gathering all necessary information about your facility.
02
Identify the utility company that will be involved in the interconnection.
03
Complete the application form with details of the generator and its capacity.
04
Provide site plans and electrical diagrams as required.
05
Include any existing permits or approvals from local authorities.
06
Outline the operational parameters and safety measures of your system.
07
Submit the completed application to the utility for review.
08
Await confirmation and any additional steps required by the utility.

Who needs Interconnection and Parallel Operating Agreement?

01
Independent power producers with generating facilities.
02
Homeowners with solar panels or other renewable energy systems.
03
Businesses looking to connect to the grid for energy generation.
04
Electric cooperatives and municipalities with generation capabilities.
Fill form : Try Risk Free
Users Most Likely To Recommend - Summer 2025
Grid Leader in Small-Business - Summer 2025
High Performer - Summer 2025
Regional Leader - Summer 2025
Easiest To Do Business With - Summer 2025
Best Meets Requirements- Summer 2025
Rate the form
4.5
Satisfied
60 Votes

People Also Ask about

Interconnection Bonds, or Solar Energy Distribution Bonds, are financial instruments designed to guarantee that the Principal, typically the developer of a renewable energy project, is responsible for the costs associated with upgrading the interconnection point to the substations.
An interconnect agreement is a business contract between telecommunications organizations for the purpose of interconnecting their networks and exchanging telecommunications traffic. Interconnect agreements are found both in the public switched telephone network and the Internet.

For pdfFiller’s FAQs

Below is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.

An Interconnection and Parallel Operating Agreement is a contractual agreement between a utility and a generator that outlines the terms and conditions under which the generator can connect to the utility's electrical grid and operate in parallel with it.
Typically, any entity or individual that intends to generate electricity and connect to a utility's grid must file an Interconnection and Parallel Operating Agreement with the utility.
To fill out an Interconnection and Parallel Operating Agreement, one should gather the necessary information about the generation facility, complete the required sections of the agreement form provided by the utility, and ensure all technical and safety standards are met before submitting it for approval.
The purpose of an Interconnection and Parallel Operating Agreement is to establish the operational guidelines and legal responsibilities of both the utility and the generator to ensure safe and reliable energy delivery and to protect the integrity of the electrical grid.
Information typically required includes the generator's system specifications, location, capacity, operational characteristics, contact information, and any relevant technical studies or assessments that demonstrate compliance with grid standards.
Fill out your interconnection and parallel operating online with pdfFiller!

pdfFiller is an end-to-end solution for managing, creating, and editing documents and forms in the cloud. Save time and hassle by preparing your tax forms online.

Get started now
Form preview
If you believe that this page should be taken down, please follow our DMCA take down process here .
This form may include fields for payment information. Data entered in these fields is not covered by PCI DSS compliance.