This document serves as an application for customers wishing to connect generating facilities with capacities greater than 100 kW and up to 1,000 kW to the EI Paso Electric Company utility system.
We are not affiliated with any brand or entity on this form
Get, Create, Make and Sign standard interconnection application

Edit your standard interconnection application form online
Type text, complete fillable fields, insert images, highlight or blackout data for discretion, add comments, and more.

Add your legally-binding signature
Draw or type your signature, upload a signature image, or capture it with your digital camera.

Share your form instantly
Email, fax, or share your standard interconnection application form via URL. You can also download, print, or export forms to your preferred cloud storage service.
How to edit standard interconnection application online
Follow the steps down below to use a professional PDF editor:
1
Sign into your account. It's time to start your free trial.
2
Prepare a file. Use the Add New button. Then upload your file to the system from your device, importing it from internal mail, the cloud, or by adding its URL.
3
Edit standard interconnection application. Rearrange and rotate pages, insert new and alter existing texts, add new objects, and take advantage of other helpful tools. Click Done to apply changes and return to your Dashboard. Go to the Documents tab to access merging, splitting, locking, or unlocking functions.
4
Get your file. Select your file from the documents list and pick your export method. You may save it as a PDF, email it, or upload it to the cloud.
pdfFiller makes working with documents easier than you could ever imagine. Try it for yourself by creating an account!
Uncompromising security for your PDF editing and eSignature needs
Your private information is safe with pdfFiller. We employ end-to-end encryption, secure cloud storage, and advanced access control to protect your documents and maintain regulatory compliance.
How to fill out standard interconnection application

How to fill out Standard Interconnection Application
01
Start by downloading the Standard Interconnection Application form from the relevant utility company website.
02
Fill in your personal information at the top of the form (name, address, contact information).
03
Provide details about the installation site, including the address and any applicable property descriptions.
04
Specify the type of generating system you are proposing (e.g., solar, wind) and its capacity.
05
Include details of the equipment you plan to use (manufacturer, model numbers, etc.).
06
Complete the technical information related to system configuration, installation, and grid connection.
07
Attach necessary documentation such as site plans, electrical diagrams, and proof of equipment certification.
08
Review the application for completeness and accuracy.
09
Sign and date the application form.
10
Submit the completed application along with any required fees to the utility company.
Who needs Standard Interconnection Application?
01
Anyone looking to connect a new electrical generating system to the utility grid, such as homeowners, businesses, or developers.
02
Individuals or organizations that wish to install renewable energy systems, like solar panel arrays or wind turbines.
Fill
form
: Try Risk Free
People Also Ask about
What is an interconnection process?
Interconnection is the complex process of connecting new electricity generators – like wind, solar, and energy storage – to the electric grid.
What is an example of an interconnection?
Perhaps the most iconic and far-reaching example of interconnection is the Internet itself, seamlessly linking countless countries through local, regional, and global networks, creating a vast and interconnected web of information exchange.
How much is the application fee for SCE interconnection?
Please NOTE: SCE charges a $75 application fee.
What is an interconnection system?
A direct connection between two or more systems in different authorization boundaries for the purpose of exchanging information and/or allowing access to information, information services, and resources.
What does interconnection mean in solar?
Connecting your home's solar panel system to our electric grid is a process called interconnection. Most residential solar installations operate in concert with our electric delivery system.
What is an interconnection application?
The Interconnection Application The application provides the utility with information about the property, electricity consumption patterns of the associated structure, and design details.
Is NEM2 still available?
NEM 2.0 is available for 20 years to new solar customers through April 13th, 2023. A successor tariff (NEM 3.0, or Net Billing) has been announced, and will be substantially less favorable for homeowners than NEM 2.0.
What are interconnection standards?
Interconnection standards are a set of requirements and procedures for both utilities and customers. Typically, they outline a multistep process. In some jurisdictions, simple systems (e.g., smaller and inverter-based) can be eligible for simplified, or fast-tracked, interconnection approval processes.
For pdfFiller’s FAQs
Below is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.
What is Standard Interconnection Application?
The Standard Interconnection Application is a formal request submitted by individuals or entities seeking to connect their generation facility to the utility grid under standardized terms and conditions.
Who is required to file Standard Interconnection Application?
Any person or organization intending to connect a small-scale generation facility, such as solar or wind installations, to the utility grid is typically required to file a Standard Interconnection Application.
How to fill out Standard Interconnection Application?
To fill out the Standard Interconnection Application, applicants must provide relevant details about their generation project, including the size, type, location, and the intended point of interconnection with the utility grid, along with any required technical specifications.
What is the purpose of Standard Interconnection Application?
The purpose of the Standard Interconnection Application is to ensure that all necessary information is gathered to assess the feasibility, safety, and compliance of connecting a generation facility to the utility grid, thereby facilitating a systematic and transparent interconnection process.
What information must be reported on Standard Interconnection Application?
The information required on the Standard Interconnection Application typically includes project details such as the generator's capacity, technology type, site location, detailed electrical diagrams, and any necessary permits or environmental assessments.
Fill out your standard interconnection application online with pdfFiller!
pdfFiller is an end-to-end solution for managing, creating, and editing documents and forms in the cloud. Save time and hassle by preparing your tax forms online.

Standard Interconnection Application is not the form you're looking for?Search for another form here.
Relevant keywords
Related Forms
If you believe that this page should be taken down, please follow our DMCA take down process
here
.
This form may include fields for payment information. Data entered in these fields is not covered by PCI DSS compliance.