Form preview

Get the free Generating Facility Interconnection Application

Get Form
This document contains the revisions to Southern California Edison’s Generating Facility Interconnection Application (Form 14-732) and updates to Rule 21 for Generating Facility Interconnections,
We are not affiliated with any brand or entity on this form

Get, Create, Make and Sign generating facility interconnection application

Edit
Edit your generating facility interconnection application form online
Type text, complete fillable fields, insert images, highlight or blackout data for discretion, add comments, and more.
Add
Add your legally-binding signature
Draw or type your signature, upload a signature image, or capture it with your digital camera.
Share
Share your form instantly
Email, fax, or share your generating facility interconnection application form via URL. You can also download, print, or export forms to your preferred cloud storage service.

Editing generating facility interconnection application online

9.5
Ease of Setup
pdfFiller User Ratings on G2
9.0
Ease of Use
pdfFiller User Ratings on G2
Use the instructions below to start using our professional PDF editor:
1
Create an account. Begin by choosing Start Free Trial and, if you are a new user, establish a profile.
2
Upload a document. Select Add New on your Dashboard and transfer a file into the system in one of the following ways: by uploading it from your device or importing from the cloud, web, or internal mail. Then, click Start editing.
3
Edit generating facility interconnection application. Rearrange and rotate pages, add new and changed texts, add new objects, and use other useful tools. When you're done, click Done. You can use the Documents tab to merge, split, lock, or unlock your files.
4
Get your file. Select the name of your file in the docs list and choose your preferred exporting method. You can download it as a PDF, save it in another format, send it by email, or transfer it to the cloud.
pdfFiller makes working with documents easier than you could ever imagine. Try it for yourself by creating an account!

Uncompromising security for your PDF editing and eSignature needs

Your private information is safe with pdfFiller. We employ end-to-end encryption, secure cloud storage, and advanced access control to protect your documents and maintain regulatory compliance.
GDPR
AICPA SOC 2
PCI
HIPAA
CCPA
FDA

How to fill out generating facility interconnection application

Illustration

How to fill out Generating Facility Interconnection Application

01
Begin with the application form provided by the utility company.
02
Fill in the applicant's contact information including name, address, and phone number.
03
Provide details about the generating facility, such as its location, type of generation (e.g., solar, wind), and capacity.
04
Include information on the interconnection type and proposed connection point to the utility's grid.
05
Attach any required documentation, such as site plans, engineering specifications, and necessary permits.
06
Review the application for completeness and accuracy.
07
Submit the application to the utility company along with any applicable fees.
08
Follow up with the utility for confirmation of receipt and any additional information or requirements.

Who needs Generating Facility Interconnection Application?

01
Anyone planning to install a generating facility that will interconnect with a utility's power grid, including businesses and residential property owners seeking to use renewable energy sources.
Fill form : Try Risk Free
Users Most Likely To Recommend - Summer 2025
Grid Leader in Small-Business - Summer 2025
High Performer - Summer 2025
Regional Leader - Summer 2025
Easiest To Do Business With - Summer 2025
Best Meets Requirements- Summer 2025
Rate the form
4.8
Satisfied
61 Votes

For pdfFiller’s FAQs

Below is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.

The Generating Facility Interconnection Application is a formal request submitted by a generation facility operator to connect their power generating unit to the electrical grid. It outlines the technical and operational details necessary for integration.
Any individual or entity operating a generation facility that intends to connect to the electrical grid must file a Generating Facility Interconnection Application.
To fill out a Generating Facility Interconnection Application, applicants need to provide details such as the facility's location, generation capacity, technology used, and any relevant engineering data. They may also need to include a site plan and plans for grid connection.
The purpose of the Generating Facility Interconnection Application is to ensure that the generation facility meets all technical and regulatory standards for connecting to the grid, facilitating safe and reliable electricity distribution.
The Generating Facility Interconnection Application must report information including the facility's technical specifications, operational parameters, potential impacts on the grid, safety measures, and any requested interconnection studies.
Fill out your generating facility interconnection application online with pdfFiller!

pdfFiller is an end-to-end solution for managing, creating, and editing documents and forms in the cloud. Save time and hassle by preparing your tax forms online.

Get started now
Form preview
If you believe that this page should be taken down, please follow our DMCA take down process here .
This form may include fields for payment information. Data entered in these fields is not covered by PCI DSS compliance.