Work Method Statement For Construction Works

Get eSignatures done in a snap

Prepare, sign, send, and manage documents from a single cloud-based solution.

What is work method statement for construction works?

A work method statement for construction works is a written document that outlines the detailed steps and procedures to be followed to complete a particular construction project. It includes information about the materials, equipment, and manpower needed, as well as the safety precautions and quality control measures to be implemented. This document serves as a guide for the construction team, ensuring that the work is carried out efficiently, safely, and in compliance with relevant regulations and standards.

What are the types of work method statement for construction works?

There are various types of work method statements for construction works, depending on the nature and complexity of the project. Some common types include: 1. General Work Method Statement: This type of statement provides a broad overview of the construction project, including the scope of work, sequencing of activities, and resource requirements. 2. Specific Work Method Statement: This type focuses on a specific aspect of the construction project, such as excavation, concrete pouring, or electrical installation. It provides detailed instructions and safety guidelines specific to that particular task. 3. Risk Assessment Method Statement: This type assesses the potential risks and hazards associated with the construction project, and outlines the measures to be taken to mitigate those risks and ensure worker safety.

General Work Method Statement
Specific Work Method Statement
Risk Assessment Method Statement

How to complete work method statement for construction works

Completing a work method statement for construction works involves several steps: 1. Identify the scope of work: Clearly define the objectives and deliverables of the construction project. 2. Break down the project into tasks: Divide the project into smaller, manageable tasks, and determine the sequence in which they need to be completed. 3. Assess potential risks: Identify any potential risks or hazards associated with each task, and develop strategies to mitigate them. 4. Define methodology and procedures: Outline the step-by-step procedures to be followed for each task, including the materials, equipment, and skills required. 5. Include safety measures: Incorporate safety guidelines and precautions to ensure the well-being of the construction team. 6. Review and approval: Review the work method statement with relevant stakeholders, such as the project manager and safety officer, and obtain their approval. 7. Communicate and update: Share the approved work method statement with the construction team, and keep it updated throughout the project as necessary.

01
Identify the scope of work
02
Break down the project into tasks
03
Assess potential risks
04
Define methodology and procedures
05
Include safety measures
06
Review and approval
07
Communicate and update

pdfFiller empowers users to create, edit, and share documents online. Offering unlimited fillable templates and powerful editing tools, pdfFiller is the only PDF editor users need to get their documents done.

Thousands of positive reviews can’t be wrong

Read more or give pdfFiller a try to experience the benefits for yourself
5.0
Very quick and friendly customer service.
Very quick and friendly customer service. It was good experience using this tool to edit, write and create new PDF doc
venkatramreddy d
4.0
Had a few problems with text had a few problems with text, once I got hang of it...
Had a few problems with text had a few problems with text, once I got hang of it, it was OK, tried to add "auto-fill" for signature of doc, having troubles.
Jay Keating
4.0
PDF Filler is a great program to add to.
PDF Filler is a great program to add to… PDF Filler is a great program to add to any small business. It is very easy to use and has handled all my needs to this point.
OVSI

Questions & answers

What Do I Need to Include in My Method Statement? The name of the project and its reference. A brief summary of what the work is. Where the work is taking place (address). Start and expected completion dates for the work. The issue date and the unique document number. Details about the company carrying out the activity.
What Do I Need to Include in My Method Statement? The name of the project and its reference. A brief summary of what the work is. Where the work is taking place (address). Start and expected completion dates for the work. The issue date and the unique document number. Details about the company carrying out the activity.
Other construction methods such as masonry (building with individual stones or bricks held together by mortar), reinforced or unreinforced concrete (a material made from a mixture of gravel, sand, cement and water), rammed-earth blocks (building blocks made of compressed earth), and Structural insulated panels (SIPs) (
What are modern methods of construction? 3D volumetric construction. Flat slabs. Timber frames. Precast panels. Concrete walls and floors. Precast foundations. Twin wall technology. Thin joint masonry.
A general outline of the overall activity and its purpose can be included here. Accessibility. Materials. Methodology and Sequence of Work. Program. Risks/Hazards Controls. Technical Information. Emergency Layout. Training and Seminars.
Rather than repeating the information already in a risk assessment, a method statement enhances the information gathered for the risk assessment and goes further in planning the sequence for the activity. For example, the risk assessment might say that supervision is required for the task.