This document provides a comprehensive guide for construction sites in Washington state on how to comply with the Construction Stormwater General Permit, including application procedures, requirements
We are not affiliated with any brand or entity on this form
Get, Create, Make and Sign construction stormwater general permit
Edit your construction stormwater general permit form online
Type text, complete fillable fields, insert images, highlight or blackout data for discretion, add comments, and more.
Add your legally-binding signature
Draw or type your signature, upload a signature image, or capture it with your digital camera.
Share your form instantly
Email, fax, or share your construction stormwater general permit form via URL. You can also download, print, or export forms to your preferred cloud storage service.
Editing construction stormwater general permit online
To use the professional PDF editor, follow these steps below:
1
Check your account. If you don't have a profile yet, click Start Free Trial and sign up for one.
2
Simply add a document. Select Add New from your Dashboard and import a file into the system by uploading it from your device or importing it via the cloud, online, or internal mail. Then click Begin editing.
3
Edit construction stormwater general permit. Rearrange and rotate pages, add new and changed texts, add new objects, and use other useful tools. When you're done, click Done. You can use the Documents tab to merge, split, lock, or unlock your files.
4
Save your file. Select it in the list of your records. Then, move the cursor to the right toolbar and choose one of the available exporting methods: save it in multiple formats, download it as a PDF, send it by email, or store it in the cloud.
With pdfFiller, it's always easy to deal with documents.
Uncompromising security for your PDF editing and eSignature needs
Your private information is safe with pdfFiller. We employ end-to-end encryption, secure cloud storage, and advanced access control to protect your documents and maintain regulatory compliance.
How to fill out construction stormwater general permit
How to fill out Construction Stormwater General Permit Requirements
01
Determine if your construction project disturbs one or more acres of land.
02
Review the state's specific requirements for the Construction Stormwater General Permit.
03
Prepare a Stormwater Pollution Prevention Plan (SWPPP) that outlines measures to be taken to prevent discharge of pollutants.
04
Complete the application form provided by the state agency regulating stormwater permits.
05
Include estimated project start and completion dates in your application.
06
Include a description of the project site and the intended construction activities.
07
Submit the completed application along with any required fees to the appropriate regulatory agency.
08
Post the permit at the construction site in a visible location as required after receiving approval.
Who needs Construction Stormwater General Permit Requirements?
01
Any construction project that disturbs one or more acres of land.
02
Projects that are part of a larger common plan of development that collectively disturb one or more acres.
03
Developers, general contractors, and construction managers involved in such projects.
Fill
form
: Try Risk Free
People Also Ask about
What is the post construction stormwater ordinance?
A post-construction stormwater management ordinance typically requires designs that implement stormwater management to limit surface discharge volumes and reduce pollutant loadings.
What is a stormwater permit?
A SWPPP is a written document that identifies activities at a facility that could cause stormwater pollution and lists the practices and procedures that the facility will take to prevent pollution from occurring.
What is Section 438 technical guidance?
Section 438 provides that the project sponsor “shall use site planning, design, construction, and maintenance strategies for the property to maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property.” This clause has been interpreted to mean that the land surrounding
What does CGP stand for in construction?
Below, EPA answers common questions on the construction stormwater permitting program. This is intended to help operators understand the permit.
What are the federal requirements for stormwater runoff from construction sites?
What Construction Activities Are Regulated. A Clean Water Act permit is required for stormwater discharges from any construction activity disturbing: 1 acre or more of land, or. Less than 1 acre of land, but that is part of a common plan of development or sale that will ultimately disturb 1 or more acres of land.
What is storm water compliance?
Stormwater compliance isn't just a term; it's a commitment to preserving our environment. When rainwater flows over roads, rooftops, and other surfaces, it can pick up pollutants and transport them to our waterways.
What is the post construction stormwater ordinance?
A post-construction stormwater management ordinance typically requires designs that implement stormwater management to limit surface discharge volumes and reduce pollutant loadings.
What is never an allowable stormwater discharge from a construction site?
Prohibit the discharge of: Wastewater from concrete washout (unless managed by appropriate control), or washout/cleanout of stucco, paint, form release oils, other wastewater materials; Fuels, oils, or other pollutants used for vehicles; and. Soaps or solvents to wash vehicles and equipment.
For pdfFiller’s FAQs
Below is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.
What is Construction Stormwater General Permit Requirements?
The Construction Stormwater General Permit Requirements refer to regulations set by environmental agencies that mandate construction sites to manage stormwater runoff to prevent pollution and protect water quality.
Who is required to file Construction Stormwater General Permit Requirements?
Any construction project that disturbs one acre or more of land, or is part of a larger common plan of development, is required to file for a Construction Stormwater General Permit.
How to fill out Construction Stormwater General Permit Requirements?
To fill out the Construction Stormwater General Permit Requirements, applicants must provide details about the project site, project description, estimated start and end dates, and a stormwater pollution prevention plan (SWPPP) outlining practices to mitigate runoff.
What is the purpose of Construction Stormwater General Permit Requirements?
The purpose of the Construction Stormwater General Permit Requirements is to minimize the impact of stormwater runoff from construction activities on local water bodies and to ensure compliance with the Clean Water Act.
What information must be reported on Construction Stormwater General Permit Requirements?
The information that must be reported includes project site information, contact details, construction schedule, description of activities, description of the stormwater management measures, and procedures for monitoring and maintaining compliance.
Fill out your construction stormwater general permit online with pdfFiller!
pdfFiller is an end-to-end solution for managing, creating, and editing documents and forms in the cloud. Save time and hassle by preparing your tax forms online.
Construction Stormwater General Permit is not the form you're looking for?Search for another form here.
Relevant keywords
Related Forms
If you believe that this page should be taken down, please follow our DMCA take down process
here
.
This form may include fields for payment information. Data entered in these fields is not covered by PCI DSS compliance.